Drying a structure correctly isn't about running a few fans and hoping — it's a calculated process based on temperature, humidity, and airflow readings.
Our Madbury, NH drying plans start with thermal imaging to map exactly where moisture is hiding.

We calculate drying requirements using temperature and humidity data, not a flat per-room rule.
Our Madbury, NH jobs run commercial LGR equipment sized to the calculated moisture load.
Thermal scans on every Madbury, NH job catch moisture a visual inspection alone would miss.
Moisture readings are logged daily throughout the Structural Drying And Dehumidification job so progress is measurable, not assumed.
Below is the calculated, documented process our Madbury, NH teams follow.

We calculate temperature, humidity, and grain depression readings to build the drying plan.
Thermal imaging often reveals moisture has traveled further than the visible damage suggested.
We position air movers to create directed airflow across wet surfaces based on the assessment.
Documented logs track the numbers from day one through final verification.
We adjust drying speed for sensitive materials like hardwood and cabinetry to prevent secondary damage.
We provide a written verification report confirming the structure has reached dry standard.
We ask enough to bring the right instruments on the first visit.
A technician arrives with thermal imaging cameras and moisture meters ready to assess.
A full diagnostic assessment comes before any equipment placement or pricing.
We verify final moisture readings against dry standard before removing equipment.

"The thermal imaging found moisture behind a wall that looked completely fine from the outside. Would have missed it otherwise." — Julian R.
"They came back every single day to take readings and showed me the numbers improving. Felt like real science, not guesswork." — Monique T.
"Our hardwood floor didn't warp because they slowed the drying process down specifically for it." — Grant P.
A room can look dry on the surface while moisture meters still detect trapped moisture inside materials.
Psychrometrics uses scientific formulas to size the drying plan to the actual moisture load.
Most jobs run 3-5 days, though hardwood and cabinetry may need longer, more controlled drying.
You'll see the actual numbers improve each day through documented logs.
Yes, we use slower, controlled drying specifically calibrated for hardwood to prevent warping.
We treat flat readings as a signal to recalculate, not something to wait out.
Madbury is within our core structural drying response zone.

Speak directly with our structural drying team.
Call +1-844-833-1325